ICF – EMU Work Order Details :



1. Underframe equipment mounting and wiring work in C Coaches of 3Ph ACEMU coaches
2. Installation of CAB AC unit in D coaches
3. Underframe equipment mounting and wiring work in D/HC Coaches of 3Ph ACEMU Coaches
4. Installation of CAB unit in D coaches of 3Ph ACEMU Coaches
5. Traction motors bellow fixing, chain cleat fixing, traction motor connection work
6. Installation of Peripheral light fittings in MEMU coaches
7. Installation of CAB AC unit & Guard side box in MEMU coaches
8. Installation of equipment in Train 18 coaches
9. Rectification work for provision of high reach pantograph in DETC coaches
10. Installation of equipment in Train 18 coaches
11. Modification works in KOLKATA metro rakes
12. Installation of Endwall panels, IV coupler , above the roof top equipment and underframe equipment in BHEL AC rakes
13. Installation of Driver desk/shunting desk, lights,Fan,Switches in BHEL AC EMUs.
14. Loading of RMPUs and RMPU control panel including Harting work in all coaches of BHEL ACEMU Rake
15. Loading of RMPU panel and Harting work in motor coaches in Train 18
16. Provision of HT cover assembly in Motor coaches
17. Modification of FL fitting
18. Alteration work in DEMU (1600Hp) cable tray
19. Installation of Pre wired trays in DEMU 1600Hp TC
20. Installation of conduits in UF of DEMU DPC Coaches
21. Underframe equipment mounting and wiring work in 3ph D/HC coaches
22. Traction motor bellows fixing chain cleat fixing and allied works in motor coaches
23. Installation of RMPUs and RMPU control panel including Harting work in all coaches of BHEL Air conditioned EMU Rake
24. Loading of equipment in BHEL Air Conditioned EMU Rake
25. Loading of equipment in EMU SWAP Rake
26. Installation of additional HT cover for cable protection in MEMU DMC coaches
27. Installation of additional HT cover for cable protection in MEMU DMC coaches
Testimonials
Sai Sathiya Engineering Works We are raring to take up more jobs with responsibility and provide our best services in the Electrical Works field.

Mark Reckon
-
We have been using the services provided by Sai Sathiya Engineering Works within past 2 years. We have outsourced some important engineering work to Sai Sathiya Engineering Works and have seen good results,

Morison
-
Sai Sathiya Engineering Works has been a tremendous resource for our engineering department. They are very precise and attentive to all our needs and have been able to learn our procedures quicker than I ever thought possible.quotes-right

Bronson Fillet
-
From the beginning, Sai Sathiya Engineering Works has been a good partner to work with. They have committed the resources, the time and the talent to make the relationship a win-win.